New Assembly building likely by Dec 2021-Jan 2022, says Metbah

Tweet Share on Tumblr Shillong, June 23: The construction of the new assembly building at Mawdiangdiang in New Shillong Township will be completed within the set time, this was informed by Meghalaya Legislative Assembly Speaker Metbah Lyngdoh. The Speaker, on Read more